Case study

Corev Longueuil

Working with the engineers and architects on design and technology requirements for a 52-storey building whose floor blocks serve different audiences: young residents, families, and 55-plus.

Mandate type
New construction
Year
In progress
Integrated systems
Mise en plan · Gestion de projet

The challenge

Design, from the earliest planning stage with the engineers and architects, the technology infrastructure of a 52-storey tower serving three audiences with very different needs at the same time — young professionals, families and residents aged 55 and over — spread across blocks of floors.

Our approach

  1. Involvement from the design phase onward to determine the technology requirements specific to each block of floors

  2. Integrated project management to coordinate all the technology trades

  3. Design of a single network backbone able to support different usage patterns per audience without duplicating the infrastructure

  4. Joint work with the engineers and architects to align technology choices with the building's architectural constraints

The outcome

The project is currently under way. The chosen approach serves three distinct resident profiles in a single tower from one technology backbone, reducing operating complexity over the long run.