Skip to main content

Projects

More than 150 buildings delivered

From residential towers to distribution centres, here is how our mandates translate into measurable results.

0+
Years of expertise
0+
Projects delivered
0+
Connected doors
0%
Client satisfaction
0/7
Technical support

45 projects

  • Corev Longueuil — New constructionNew constructionIn progress

    Corev Longueuil

    • 52 floors
    • 650 units

    Working with the engineers and architects on design and technology requirements for a 52-storey building whose floor blocks serve different audiences: young residents, families, and 55-plus.

    • Mise en plan
    • Gestion de projet
    Read the case study
  • Montoni HBML — New constructionNew constructionIn progress

    Montoni HBML

    • 13 floors
    • 300 units

    Support for the client through design and tendering, project management of the technology scope, and unified network installation: Wi-Fi, access control, cameras and HVAC.

    • Gestion de projet
    • Réseaux & Wi-Fi
    • Contrôle d'accès
    • Vidéosurveillance
    • HVAC
    Read the case study
  • Utile St-Sacrement — New constructionNew constructionIn progress

    Utile St-Sacrement

    • 10 floors
    • 235 units

    Project management of the technology scope plus unified network installation: Wi-Fi, access control, cameras and HVAC. Termination and testing of every network cable in the apartments.

    • Gestion de projet
    • Réseaux & Wi-Fi
    • Contrôle d'accès
    • Vidéosurveillance
    • HVAC
    • Certification de câblage
    Read the case study
  • Vaudreuil — Phase 2 — New constructionNew constructionIn progress

    Vaudreuil — Phase 2

    • 12 floors
    • 198 units

    Design coordination with the engineers and architects, project management, and RJ45 plus fibre-optic cabling throughout the building — apartments, common areas and service spaces. Online-mode Salto access control, intercom, cameras, audio, administrative telephony, plus management and connection of the EV charging stations. Harmonised and standardised with phase 1 so both phases share one technology backbone.

    • Gestion de projet
    • Fibre optique
    • Contrôle d'accès
    • Intercom & visio
    • Vidéosurveillance
    • Sonorisation
    • Téléphonie
    • Bornes de recharge
    Read the case study
  • Village Lacey Green — New constructionNew constructionIn progress

    Village Lacey Green

    • 9 floors
    • 252 units

    Unified network installation covering Wi-Fi, access control, cameras, water valves and HVAC, plus smart water valves in the units.

    • Réseaux & Wi-Fi
    • Contrôle d'accès
    • Vidéosurveillance
    • Valves d'eau
    • HVAC
    Read the case study
  • Yimby 1 — ajout d'appartements — Addition while operatingAddition while operatingIn progress

    Yimby 1 — ajout d'appartements

    • 1 floors
    • 5 units

    Management and installation of fibre optics, RJ45 cabling, access control and GPON equipment for internet distribution.

    • Gestion de projet
    • Fibre optique
    • Câblage
    • Contrôle d'accès
    • PON / GPON
    Read the case study
  • Zenia St-Hyacinthe — New constructionNew constructionIn progress

    Zenia St-Hyacinthe

    Saint-Hyacinthe

    • 9 floors
    • 158 units

    Design coordination with the engineers and architects, project management, and RJ45 plus fibre-optic cabling throughout the building — apartments, common areas and service spaces. Online-mode Salto access control, intercom, cameras, audio, administrative telephony, plus management and connection of the EV charging stations.

    • Gestion de projet
    • Fibre optique
    • Contrôle d'accès
    • Intercom & visio
    • Vidéosurveillance
    • Sonorisation
    • Téléphonie
    • Bornes de recharge
    Read the case study
  • 3590 Ontario Est — Addition while operatingAddition while operating2026

    3590 Ontario Est

    Intercom with facial recognition and unit access, plus cameras to prevent unauthorised entry.

    • Intercom & visio
    • Contrôle d'accès
    • Vidéosurveillance
    Read the case study
  • 450 Concorde — New constructionNew construction2026

    450 Concorde

    Laval

    • 6 floors
    • 73 units

    Unified network installation covering Wi-Fi, access control, cameras, water valves and HVAC.

    • Réseaux & Wi-Fi
    • Contrôle d'accès
    • Vidéosurveillance
    • Valves d'eau
    • HVAC
    Read the case study
  • Dollarama Distribution — Addition while operatingAddition while operating2026

    Dollarama Distribution

    Outdoor point-to-point Wi-Fi network serving the parking lot cameras.

    • Réseaux & Wi-Fi
    • Vidéosurveillance
    Read the case study
  • Fortin Radio Auto — Major renovationMajor renovation2026

    Fortin Radio Auto

    Management and installation of cameras, facial-recognition access control and the wireless network.

    • Gestion de projet
    • Vidéosurveillance
    • Contrôle d'accès
    • Réseaux & Wi-Fi
    Read the case study
  • Le Bosco — New constructionNew construction2026

    Le Bosco

    1050, boulevard Décarie, Montréal, QC H4A 3H9

    • 12 et 6 floors
    • 230 units

    Unified network installation covering Wi-Fi, access control, cameras, water valves and HVAC.

    • Réseaux & Wi-Fi
    • Contrôle d'accès
    • Vidéosurveillance
    • Valves d'eau
    • HVAC
    Read the case study
  • Le Cambridge — Renovation while operatingRenovation while operating2026

    Le Cambridge

    Pointe-Claire

    • 7 floors
    • 533 units

    Renovation of several departments of the residence, including cabling, with the main telecom room decommissioned without any service interruption.

    • Câblage
    • Réseaux & Wi-Fi
    Read the case study
  • Le Cherbourg — CapexCapex2026

    Le Cherbourg

    • 8 floors
    • 271 units

    Complete replacement of the Meraki network equipment with licence-free Ubiquiti hardware, delivering internet across every apartment and common area.

    • Réseaux & Wi-Fi
    Read the case study
  • Le Dufferin — Renovation while operatingRenovation while operating2026

    Le Dufferin

    • 5 floors
    • 189 units

    Camera replacement and cabling overhaul.

    • Vidéosurveillance
    • Câblage
    Read the case study
  • Le Graham — Renovation while operatingRenovation while operating2026

    Le Graham

    Mont-Royal

    • 5 floors
    • 145 units

    Renovation of several departments of the residence, including cabling, with the main telecom room decommissioned without any service interruption.

    • Câblage
    • Réseaux & Wi-Fi
    Read the case study
  • Le Manoir St-Augustin — CapexCapex2026

    Le Manoir St-Augustin

    Gaspé

    • 6 floors
    • 123 units

    Complete replacement of the Meraki network equipment with licence-free Ubiquiti hardware, plus full Wi-Fi coverage.

    • Réseaux & Wi-Fi
    Read the case study
  • Livélilia — Renovation while operatingRenovation while operating2026

    Livélilia

    • 10 floors
    • 247 units

    Renovation of several departments of the residence, including cabling, with the main telecom room decommissioned without any service interruption.

    • Câblage
    • Réseaux & Wi-Fi
    Read the case study
  • Minakem Delmar — Addition while operatingAddition while operating2026

    Minakem Delmar

    Management and cabling within an explosion-hazard zone.

    • Gestion de projet
    • Câblage
    Read the case study
  • Square Bellevue — Lot 3 — New constructionNew construction2026

    Square Bellevue — Lot 3

    425, boulevard des Anciens-Combattants, Sainte-Anne-de-Bellevue, QC H9X 0B9

    • 9 floors
    • 172 units

    Unified network installation covering Wi-Fi, access control, cameras, water valves and HVAC, plus compliance testing of the complete network cabling.

    • Réseaux & Wi-Fi
    • Contrôle d'accès
    • Vidéosurveillance
    • Valves d'eau
    • HVAC
    • Certification de câblage
    Read the case study
  • Tour Laurier — New constructionNew construction2026

    Tour Laurier

    • 23 floors
    • 169 units

    Project management of the technology scope plus unified network installation: Wi-Fi, access control, cameras and HVAC. Termination and testing of every network cable in the apartments.

    • Gestion de projet
    • Réseaux & Wi-Fi
    • Contrôle d'accès
    • Vidéosurveillance
    • HVAC
    • Certification de câblage
    Read the case study
  • Utile Méridien — New constructionNew construction2026

    Utile Méridien

    Montréal

    • 13 floors
    • 168 units

    Project management of the technology scope plus unified network installation: Wi-Fi, access control, cameras and HVAC. Termination and testing of every network cable in the apartments.

    • Gestion de projet
    • Réseaux & Wi-Fi
    • Contrôle d'accès
    • Vidéosurveillance
    • HVAC
    • Certification de câblage
    Read the case study
  • Utile MultiSite — Addition while operatingAddition while operating2026

    Utile MultiSite

    A centralised Salto server to manage every building in the Utile portfolio.

    • Contrôle d'accès
    Read the case study
  • Utile St-Patrick — New constructionNew construction2026

    Utile St-Patrick

    Montréal

    • 6 floors
    • 95 units

    Project management of the technology scope plus unified network installation: Wi-Fi, access control, cameras and HVAC. Termination and testing of every network cable in the apartments.

    • Gestion de projet
    • Réseaux & Wi-Fi
    • Contrôle d'accès
    • Vidéosurveillance
    • HVAC
    • Certification de câblage
    Read the case study
  • Dentist 123 — Major renovationMajor renovation2025

    Dentist 123

    Management and installation of the audio and camera systems.

    • Gestion de projet
    • Sonorisation
    • Vidéosurveillance
    Read the case study
  • Edison — New constructionNew construction2025

    Edison

    • 5 floors
    • 166 units

    Unified network installation covering Wi-Fi, access control, cameras, water valves and HVAC.

    • Réseaux & Wi-Fi
    • Contrôle d'accès
    • Vidéosurveillance
    • Valves d'eau
    • HVAC
    Read the case study
  • Espace Montmorency — garages — CapexCapex2025

    Espace Montmorency — garages

    Cellular coverage installed throughout the garages, plus a Fortinet network linking the metro to the garages to support the cameras.

    • Couverture cellulaire
    • Réseaux & Wi-Fi
    • Vidéosurveillance
    Read the case study
  • Genia Lasalle — Major renovationMajor renovation2025

    Genia Lasalle

    Montréal (LaSalle)

    • 6 floors
    • 148 units

    Design coordination with the engineers and architects, project management, and RJ45 plus fibre-optic cabling throughout the building — apartments, common areas and service spaces. Online-mode Salto access control, cameras, audio, intercom, administrative telephony and management. A PON system distributes internet and telephony to residents, harmonised with the previous phase into a single unified technology backbone.

    • Gestion de projet
    • Fibre optique
    • Contrôle d'accès
    • Vidéosurveillance
    • Intercom & visio
    • Sonorisation
    • Téléphonie
    • PON / GPON
    Read the case study
  • Le Conrad — New constructionNew construction2025

    Le Conrad

    • 12 floors
    • 136 units

    Unified network installation covering Wi-Fi, access control, cameras, water valves and HVAC.

    • Réseaux & Wi-Fi
    • Contrôle d'accès
    • Vidéosurveillance
    • Valves d'eau
    • HVAC
    Read the case study
  • Le Tom — New constructionNew construction2025

    Le Tom

    Montréal

    • 5 floors
    • 110 units

    Unified network installation covering Wi-Fi, access control, cameras, water valves and HVAC.

    • Réseaux & Wi-Fi
    • Contrôle d'accès
    • Vidéosurveillance
    • Valves d'eau
    • HVAC
    Read the case study
  • Monroe — New constructionNew construction2025

    Monroe

    • 8 floors
    • 134 units

    Unified network installation covering Wi-Fi, access control, cameras, water valves and HVAC.

    • Réseaux & Wi-Fi
    • Contrôle d'accès
    • Vidéosurveillance
    • Valves d'eau
    • HVAC
    Read the case study
  • Omnia Young — New constructionNew construction2025

    Omnia Young

    • 9 floors
    • 67 units

    Unified network installation covering Wi-Fi, access control, cameras, water valves and HVAC.

    • Réseaux & Wi-Fi
    • Contrôle d'accès
    • Vidéosurveillance
    • Valves d'eau
    • HVAC
    Read the case study
  • One Square Phillips — New constructionNew construction2025

    One Square Phillips

    1, Square Phillips, Montréal, QC H3B 3C9

    • 61 floors
    • 796 units

    Unified network installation covering Wi-Fi, access control, cameras, water valves and HVAC.

    • Réseaux & Wi-Fi
    • Contrôle d'accès
    • Vidéosurveillance
    • Valves d'eau
    • HVAC
  • Things Factory Vancouver — New constructionNew construction2025

    Things Factory Vancouver

    • 29 floors
    • 338 units

    Project management for the water valve installation.

    • Gestion de projet
    • Valves d'eau
    Read the case study
  • Villa Opale Lachine — Major renovationMajor renovation2025

    Villa Opale Lachine

    • 6 floors
    • 224 units

    Full building renovation for a change of use — now a seniors residence. Project management and installation of access control, audio, separate administrative and resident networks, nurse call and pull cords, cabling and intercom.

    • Gestion de projet
    • Contrôle d'accès
    • Sonorisation
    • Réseaux & Wi-Fi
    • Appel de garde
    • Câblage
    • Intercom & visio
    Read the case study
  • Yimby 2 et 1 — CapexCapex2025

    Yimby 2 et 1

    • 10 floors
    • 477 units

    Complete replacement of the Meraki network equipment with licence-free Ubiquiti hardware for building-wide internet, plus cameras added on every floor including cabling.

    • Réseaux & Wi-Fi
    • Vidéosurveillance
    • Câblage
    Read the case study
  • Zenia Mirabel — New constructionNew construction2025

    Zenia Mirabel

    Mirabel

    • 8 floors
    • 348 units

    Project management and unified network installation: Wi-Fi, access control, cameras and HVAC, plus Sinopé water valves.

    • Gestion de projet
    • Réseaux & Wi-Fi
    • Contrôle d'accès
    • Vidéosurveillance
    • HVAC
    • Valves d'eau
    Read the case study
  • Le Waldorf — CapexCapex2024

    Le Waldorf

    • 8 floors
    • 214 units

    Camera system installed in the care units of an all-concrete building, working around residents with reduced autonomy.

    • Vidéosurveillance
    Read the case study
  • Mansfield — New constructionNew construction2024

    Mansfield

    1228, rue Mansfield, Montréal, QC H3B 4G8

    • 19 floors
    • 226 units

    Unified network installation covering Wi-Fi, access control, cameras, water valves and HVAC.

    • Réseaux & Wi-Fi
    • Contrôle d'accès
    • Vidéosurveillance
    • Valves d'eau
    • HVAC
    Read the case study
  • Azailis Repentigny — New constructionNew construction2022

    Azailis Repentigny

    • 30 floors
    • 334 units

    Design coordination with the engineers and architects, project management, and RJ45 plus fibre-optic cabling throughout the building — apartments, common areas and service spaces. Online-mode Salto access control, cameras, audio, intercom, administrative telephony and management. A PON system distributes internet and telephony to residents, harmonised with the previous phase into a single unified technology backbone.

    • Gestion de projet
    • Fibre optique
    • Contrôle d'accès
    • Vidéosurveillance
    • Intercom & visio
    • Sonorisation
    • Téléphonie
    • PON / GPON
    Read the case study
  • District Union Lachenaie — New constructionNew construction2022

    District Union Lachenaie

    • 13 floors
    • 598 units

    Design coordination with the engineers and architects, project management, and RJ45 plus fibre-optic cabling throughout the building — apartments, common areas and service spaces. Online-mode Salto access control, cameras, audio, intercom, administrative telephony and management. A PON system distributes internet and telephony to residents, harmonised with the previous phase into a single unified technology backbone.

    • Gestion de projet
    • Fibre optique
    • Contrôle d'accès
    • Vidéosurveillance
    • Intercom & visio
    • Sonorisation
    • Téléphonie
    • PON / GPON
    Read the case study
  • Espace Montmorency — Tours 1 et 4 — New constructionNew construction2022

    Espace Montmorency — Tours 1 et 4

    • 23 floors
    • 700 units

    Design coordination with the engineers and architects, project management, and RJ45 plus fibre-optic cabling throughout the building — apartments, common areas and service spaces. Online-mode Salto access control, cameras, audio, intercom, administrative telephony and management. A PON system distributes internet and telephony to residents, harmonised with the previous phase into a single unified technology backbone.

    • Gestion de projet
    • Fibre optique
    • Contrôle d'accès
    • Vidéosurveillance
    • Intercom & visio
    • Sonorisation
    • Téléphonie
    • PON / GPON
    Read the case study
  • Corev Beloeil — New constructionNew construction2019

    Corev Beloeil

    Beloeil

    • 7 floors
    • 258 units

    Design coordination with the engineers and architects, project management, and RJ45 plus fibre-optic cabling throughout the building — apartments, common areas and service spaces. Online-mode Salto access control, cameras, audio, intercom, administrative telephony and management. A PON system distributes internet and telephony to residents, harmonised with the previous phase into a single unified technology backbone.

    • Gestion de projet
    • Fibre optique
    • Contrôle d'accès
    • Vidéosurveillance
    • Intercom & visio
    • Sonorisation
    • Téléphonie
    • PON / GPON
    Read the case study
  • Panorama Ste-Dorothée — New constructionNew construction2019

    Panorama Ste-Dorothée

    • 30 floors
    • 286 units

    Design coordination with the engineers and architects, project management, and RJ45 plus fibre-optic cabling throughout the building — apartments, common areas and service spaces. Online-mode Salto access control, cameras, audio, intercom, administrative telephony and management. A PON system distributes internet and telephony to residents, harmonised with the previous phase into a single unified technology backbone.

    • Gestion de projet
    • Fibre optique
    • Contrôle d'accès
    • Vidéosurveillance
    • Intercom & visio
    • Sonorisation
    • Téléphonie
    • PON / GPON
    Read the case study
  • Rivia Victoriaville — New constructionNew construction2019

    Rivia Victoriaville

    Victoriaville

    • 6 floors
    • 253 units

    Design coordination with the engineers and architects, project management, and RJ45 plus fibre-optic cabling throughout the building — apartments, common areas and service spaces. Online-mode Salto access control, cameras, audio, intercom, administrative telephony and management. A PON system distributes internet and telephony to residents, harmonised with the previous phase into a single unified technology backbone.

    • Gestion de projet
    • Fibre optique
    • Contrôle d'accès
    • Vidéosurveillance
    • Intercom & visio
    • Sonorisation
    • Téléphonie
    • PON / GPON
    Read the case study